Explain the construction technology of utsen insulation material glass wool wall
2021-10-08       Source:尤特森保溫材料

Glass wool has many advantages such as fire prevention, heat preservation and insulation, sound absorption and noise reduction, and easy to cut. It is one of the most commonly used materials for building heat preservation and sound absorption.  However, because the surface of centrifugal glass wool is not decorative, and there will be fibers scattered, so it must be concealed.  The construction process of glass wool insulation mainly includes the following aspects:  

  

1. Glass wool materials must have factory certificate and inspection report after entering the site, and can be installed after re-inspection.  

  

2, after the construction of the keel, in the keel sandwich shop stick fireproof glass wool insulation layer, glass cotton external insulation wall is composed of three parts of the wall structure layer, insulation layer, decorative layer, the main technical key to make the external insulation wall is: insulation layer and structural layer in connection.  

  

3. Connection mode between thermal insulation layer and structural layer:  Thermal insulation layer and structure layer connection with 8 * 120 disc plastic expansion bolt, 7 layer under each 5 expansion bolt, glass wool board layer 7 above each glass wool board eight disc plastic expansion bolt, glass wool board thickness of 80 mm, in order to ensure the expansion bolt anchor into the structure layer is more than 25, marking on the bit, ensure that the thickness of the glass wool board are negative.  

  

4, glass wool board installation  

  

1) The layout requirements of glass wool board: according to the standard whole sheet format, the board shall be staggered from bottom to top along the horizontal direction according to the length of 1/2 board.  Vertical staggered connection of fixed plates from the wall corner to ensure that the corner is straight and vertical.  Interlocking glass wool board at Yin and Yang angles.  Glass wool at the corners of doors and Windows should not be spliced. The whole piece of glass wool board should be used to cut and form the incision perpendicular to the board surface. The corners of the wall should be pasted and fixed with the same insulation board.  

 

2) the laying method of glass wool board is designed before use.  Calculate the size of cutting, cutting edge linear error should be less than 5 mm, the joint is not more than 2 mm, the gap between the plate and the plate using special adhesive tape.  

 

3) The glass wool board is connected from top to bottom. The glass wool board should be laid in sequence. When it meets the door and window opening, it should meet the requirements of the relevant atlas.  

高樓外墻保溫施工.jpg

  

4) Glass wool board surface anchorage and surface treatment  

 

Anchoring: in the installation of glass wool insulation board anchoring parts installed into the structural wall depth of not less than 25 mm.  Anchor bolts with a diameter of 8x120mm are used for anchoring, and electric hammer is used to drill holes in the outer wall with a diameter of 10mm.  The depth of the hole is 120-130 mm (including the thickness of the insulation board), and the plastic expansion bolt is installed and strengthened, so that the glass wool board is closely combined with the external wall.  

 

The anchorage point should be 1-2 mm below the surface of the glass wool board after fastening.  Anchorage point layout: in the glass wool board four corners and the middle of the horizontal seam are set up anchorage points.  

 

Anchor bolts are installed with a longitudinal spacing of 300 mm, a transverse spacing of 400 mm, and a quin-shaped layout. The corner of the wall at the base is encrypted to a spacing of 200 mm, and meets the requirements of the design and related standards.  

  

5, system waterproof and special parts of the treatment  

  

In the window door hole, the length and width of the plate are determined according to the wall part of the site.  

 

Waterproof and moisture-proof: Each glassy cotton board should be packed in a small plastic bag. Before installation, check whether the plastic bag is damaged or not.  Before hanging stone on the top of glass cotton board after construction, it should be covered with plastic sheets to prevent rain leakage on the inside of glass cotton board;  Glassy cotton board corner parts of naked leakage glassy cotton board, use the same material as the surface layer of aluminum foil stick firmly;  Stone joints silicone sealant must be tight.  

 

Prevent hot Bridges.  The embedded iron parts on each layer of the structure are welded with the main keel. The embedded parts here are hot Bridges. The inner side of each side beam is coated with 15mm thick Portland cement mortar partition hot bridge.  

 

Check the anchorage point, flatness and bonding quality of the glass wool board after the paving of grade A fireproof non-combustible glass wool board is finished, and dry hanging stone can be carried out after qualified.  

玻璃棉板  

6. Quality requirements and guarantee measures  

 

1) Basic treatment: vertical, flatness within 5 mm.  All the embedded parts such as downfalls and lines before the fixed plate must be installed according to the requirements of design drawings and construction acceptance specifications.  Scaffolding should be at least 300 mm away from the wall.  

 

2) Cutting glass wool board: special knife and saw to ensure the precise size of the board and neat cutting edge.  

 

3) glass wool board: to strictly control the thickness of glass wool board, uniform width, straight, must ensure consistent combination, corner should bite stubble lap.  

 

4) Requirements of system parts:  

 

A. The apparent density of glass wool board should meet the design requirements.  

 

B. glass wool board surface shall not be exposed for a long time, to prevent glass wool board be affected with damp be affected with damp, each packed in small plastic bags, glass wool board at the top of the wall body with plastic film covering glass wool board, glass wool board should be timely inspection, after installed and is installed outside dry hanging stone, and in a timely manner to play good weather resistance silicone sealant, prevent ooze water when it rains.  

 

C. Check the standard value of tensile bearing capacity of a single anchor bolt is greater than or equal to 0.3kN.  

 

D. When installing glass wool panels, the panel seams should be tightly squeezed, the adjacent panels should be flush, the gap between the panels should not be greater than 2 mm, and the height difference between the panels should not be greater than 1.5 mm.  

 

E. The ambient temperature of external thermal insulation construction shall not be less than 5℃, and construction shall be prohibited in windy weather and rainy weather above grade 5.  

 

F. Quality deviation requirements meet relevant regulations.  

  

7. Quality inspection  

 

All kinds of materials should be inspected before entering the site in addition to production license, product certificate, test report and other certificates, glass wool board should meet the requirements of GB/T17795-1999.  During the construction process, the project manager assigned special personnel to strengthen management.  In the construction of each sub-project after inspection, acceptance can be carried out after the next process.  Glass wool board shape should be smooth, no obvious expansion and contraction deformation, no oil stains and impurities.  The size and allowable error must meet the specification requirements.  When the external wall insulation materials enter the site, they should be accepted and re-inspected according to the relevant national and provincial standards for building materials.  

 

According to db129-126-20052 Wall insulation inspection Report standard 5.3.4, each inspection batch of 4000㎡ shall be executed.  Collect and summarize the completion acceptance data of external insulation during construction.  

 

External wall insulation system design documents, drawings review, design changes and negotiation records.  External insulation system inspection report and its main components of the product certificate, factory inspection report, site re-inspection report and site acceptance record, construction process record and construction quality inspection record.  

久久国产劲爆内射-91麻豆国产亚洲永久-日韩av最近中文字幕-久久夜色精品国产欧美乱 | 久久 精品 中文字幕-色拉拉av综合在线-久久中文字幕有码国产精品-亚洲欧美日韩视频一区 | 国产一区二区欧美在线-日韩成人动漫在线观看视频-中文字幕日本免费在线-东京热一av一区二区 | 一区二区三区四区五区伊人-av中文字幕免费看-国产欧美日韩免费成人-婷婷激情五月手机版 | 欧美人妻久久久久久综合-五月婷婷av网址在线-色婷婷综合专区-91乱子伦国产乱子伦无 | 91人妻精品国产麻豆-日韩av午夜免费电影-日韩精品资源在线观看,-欧美日韩激情图片亚洲 | 91香蕉伊人综合久久-99精品视频在线在线观看视频-日韩中文字幕在线视频第一页-中文字幕熟女久久久人 | 91麻豆免费观看视频-在线成人国产亚洲一区二区-人妻激情视频一区二区三区四区-在线观看日韩男女 久久精品在线看久久-亚洲区成人综合自拍-国产精品久久妇女蜜臀-久久久亚洲老熟女 | 激情五月婷婷激情综合-中文字幕高清av王-国产中文字幕骚在线观看-日韩,欧美一区二区三区 | 99热免费在线精品-亚洲精品中文字幕网址-大香蕉超碰成人网-久久精品噜噜噜成人av | 色婷婷的五月天-日韩av小视频-久久久久久人妻精品一区二-亚洲黄色一及片免费看 | 亚洲熟女久久 国产-久久国产一区二区三区-欧美黑人xxxx高潮猛交野战-日韩av三级免费电影 | 国产又粗又猛又大爽的视频-久久爱鲁鲁鲁鲁夜夜-日韩人妻丰满中文字幕-久久中文字幕亚洲高清 | 国产乱淫av人妻无-国产精品久久久久久久夜色-视频在线观看免费完整高清中文-成人免费在线观看av 成人精品1024欧美日韩-99日本精品久久久久久人妻-91极品粉嫩鲍鱼在线观看-久久九九99国产精品 | 久久偷拍女人小便视频-国产欧美韩日在线观看-日韩美在线免费观看-日韩另类小视频 | 国产成人一区二区三区欧美日韩成人-91婷婷久久激情-日日夜夜精品视频综合网-91精品国产91久久久久蜜臀 | 国产亚洲精品中文字幕人-国产精品久久久久久中文字幕-国产激情一区二区三区成人免费-999精品久久久久 | 婷婷婷婷久久久久-久久久精品日本人妻-久久久久久久精品婷婷-99国产精品视频在线 | 亚洲精品乱码久久久久久韩国-久操人妻在线视频免费观看-久久久久亚洲av毛片大全软件-麻豆文化传媒精品一区观看 | 国产免费69成人精品视频-日本中文字幕一区二区三区高清-avi免费中文字幕-蜜桃臀久久久蜜桃臀 | 久久夜色精品国产隔壁老王-亚洲精品乱码白浆高清久久久久久-91麻豆国产高清产精品-久久国产精品人人片 | 亚洲图片日韩视频一区二区-久久久99久久这里只有精品-免费成人看大片-久久久久亚洲美女啪啪 | 1024久久久亚洲精品aⅴ-91超碰在线资源站-久久中文av字幕-99久久国产极品蜜臀免费视频 | 91成人区人妻精品一区二区不卡-久久精品久久久久久久婷婷-yeezy350亚洲限定色-91夜夜蜜桃一区二区三区 | 日韩v亚洲v欧美v精品综合-av岛国片在线免费观看-久久久久久久久久久久久久久六-…亚洲熟女少妇一区二区三区 | 久久re视频在线免费观看-第四色婷婷在线观看视频-久久天天操狠狠操夜夜av-成人黄色大片在线播放 91综合精品久久久久久-五月欧美一区二区-久久久少妇人妻91久久久久-国产麻豆大片在线观看 | 日韩av中文一区二区三区-美女一区在线视频-黑人性视频多人欧美-精品人妻一区二区三区含 | 亚洲大胆日韩视频专区-午夜精品久久久久久久91蜜桃-91久久久国产精品视频-日本精品啪啪啪一区二区三区 | 国产三级日韩三级欧美三级-东京热av精品人妻一区二区三区-午夜老司机视频免费-蜜臀av不卡综合 | 久久久久成人亚洲综合精品-999在线视频精品免费播放观看-欧美日韩一级久久道-国产麻豆精品视频免费观看 | 中文字幕国产不卡一区-欧美日韩伦理一区二区三区-久久久精品久久久精品久久-国产精品视频爽爽爽 9久久婷婷国产综合精品性色-日韩日韩日韩日韩日韩日韩av-99久久亚洲精品婷婷-日韩激情中文字幕视频 | 人人妻人人澡人人爽人人精品jk-超碰夫妻97人人夫妻-欧美日韩美女福利怡红院-成人午夜sm精品久久久久久久 | 91精品国产综合av蜜臀-极品亚洲精品国产精品国自产99-欧美丰满熟妇xxxx性久久久久-日韩成人在线大片 | 国产一区二区三区四区五区在线视频-内射亚洲少妇逼逼-欧美精品乱码久久久久久,欧-精品人妻少妇一区二区三区不卡 | 超碰97人妻在线视频-91精品91久久久久久久-日韩人妻在线中文字幕在线视频-91精品国产综合久久精品密臀 | 精品人妻av中文字幕-人妻熟女中文字幕在线播放-国产精品操美女视频-人妻丰满精子一区二区 | 91国精产品一区二区三区-2021中文在线热码视频-国产精品99久久久久久成人四虎-九九在线视频免费看 | 日韩欧美亚洲爱爱第一页-麻豆免费观看全集在线观看-中文字幕久久人妻精品-蜜臀久久99精品久久一区二区 | 成人精品1024欧美日韩-99日本精品久久久久久人妻-91极品粉嫩鲍鱼在线观看-久久九九99国产精品 | 人人妻人人澡人人爽久久av/-欧美黑人精品视频在线-麻豆精品传媒国产av在-国产中文字幕美女 | 麻豆出品004在线-精品日韩av在线免费观看-日韩精品视频久-国产又大又黄又粗又爽视频 |